The smart + newbuild offers a turnkey solution, in response to the building heating regulations

The Ministerial Order of 26 June 2018 indicates the new measures to be followed regarding the thermal characteristics of new buildings, renovations of existing buildings and extensions.

Articles 24 and 35 specifically impose the measurement of energy consumption per usage (heating, air-conditioning, domestic hot water, lighting, ventilation, etc.) and the installation of consumption monitoring devices.

The solution is approved by the Princely Government as meeting the criteria of the Monegasque building heating regulations.

smart + measures energy consumption

for heating

for cooling

for lighting

for ventilation systems

per direct connection greater than 80 amps

for production of domestic hot water

And reproduces them on a dashboard monitoring building consumption

smart + (newbuild) brochure

Consult our brochure for more information
and do not hesitate to contact the SMEG customer services department : 92 05 66 44


For existing buildings, please consult our smart + offer

Connect to our demonstration platform

https://smartplus.smeg.mc/

username : demosmart@smeg.mc

password : smeg

Contact us for a free estimate

Customer Services Department

+377 92 05 66 44